Grain and oil crops transloading terminal for river transport
(Voznesensk district, Mykolaiv region)
2016
Client: LLC AE NIBULON
Works performed: construction of an underground transport gallery from vehicle unloaders to the working tower, construction of overpasses with grain storage galleries for 5.5 thousand t.
Photo: walls (caisson) metal waterproofing, reinforcement of walls and floors. Installation of formwork and concreting of columns and walls. Slab treatment with concrete.