Our new facility in 2017: grain and oil crops transloading terminal for river transport, LLC AE “NIBULON”, village Bilenka, Zaporizhzhia district, Zaporizhzhia region. New construction.
TRANSPORTER BRIDGE FOR TRANSLOADING TERMINAL
Date: 11.05.2017
Return to the "News"