Reconstruction of the grain and oil crops receiving, primary processing, and storage facility at the premises of PJSC Kremin
(Ichnia district, Chernihiv region)

2018

Client: PJSC Kremin

Works performed: production and installation of such metal structures:

Noria tower – 27.32 tons,

Transport gallery – 7.31 tons

Overpass of engineering communications – 2.26 tons

Grain shipment point for road transport – 4.11 tons.

The total volume of assembled steel structures – 41.0 t.

Ask a question

delete

Your Name (required)

Your Email (required)

Subject

Your Message

Order call

delete [contact-form-7 404 "Not Found"]