Arrangement of Khrestyshchenske GCF. Reconstruction of the Khrestyshchenska booster compressor station.
(Krasnograd district, Kharkiv region)
2014 – 2015
Client: LLC Karpatygaz
Works performed: general contractor services.
Arrangement of pile field – 1300 pcs.
Installation of reinforced concrete foundations – 1200 m³
Installation of technological equipment (including 4 turbo-compressors Titan-130).
Production and installation of steel and stainless steel pipelines and pipe assemblies with diameters from 18×3 mm to 1420×25 mm, total weight – approximately 580 t.