Arrangement of Khrestyshchenske GCF. Reconstruction of the Khrestyshchenska booster compressor station.
(Krasnograd district, Kharkiv region)

2014 – 2015 

Client: LLC Karpatygaz 

Works performed: general contractor services.

Arrangement of pile field – 1300 pcs.

Installation of reinforced concrete foundations – 1200 m³

Installation of technological equipment (including 4 turbo-compressors Titan-130).

Production and installation of steel and stainless steel pipelines and pipe assemblies with diameters from 18×3 mm to 1420×25 mm, total weight – approximately 580 t.

Production and installation of cable trestles made of rolled steel with a total length of approximately 2,500 m.